Zum Inhalt
Verein in Gründung
Pilotbetrieb

Diese Plattform befindet sich im Pilotbetrieb. Trotz sorgfältiger Prüfung können Inhalte und Funktionen Fehler enthalten. Bitte überprüfe wichtige Angaben anhand der verlinkten Originalquellen.

SW-Version alpha 0.41
Darstellung: System
Sprache: DE

Dependency on the United States

3. Dependency on the United States

ITAR Export Controls and Source Code Access

The Pentagon maintains a strict policy of never sharing source codes for US weapons systems -- not even with its closest allies [15]. The F-35 software comprises over 25 million lines of code. Foreign nations receive no unsupervised access to the F-35 and its critical mission systems [15].

Only Israel holds a unique position: the F-35I "Adir" features Israeli-developed mission software and operates independently from the central US system [16][17]. The United Kingdom fought for five years to obtain an ITAR waiver for operational sovereignty [18].

Foreign Military Sales (FMS)

Switzerland's F-35s are being procured through the FMS process [19]. This means:

  • No control over delivery schedules (US production takes priority)
  • Dependence on US Congressional approvals
  • No possibility for direct commercial negotiations
  • Limited customisation options

Turkey: Programme Exclusion as a Warning Sign

Turkey was expelled from the F-35 programme in July 2019 after procuring the Russian S-400 system [20][21]. Ankara had already invested USD 1.4 billion in advance payments [20]. The case demonstrates that US export controls can be politically instrumentalised, and that even NATO partners are not protected from programme exclusion.

Swiss Context

As a neutral state, Switzerland has neither NATO special status nor a strategic relationship with the USA comparable to Israel's. The F-35 procurement establishes a long-term political and technical dependency that extends beyond the aircraft's service life (30+ years).


Translated from the German version. See the German version for complete references.


→ See also: Procurement Costs and Cost Overruns